Feasibility Studies of Infrastructure Projects on the ACROSS Projects in Kebbi State
AI summary
Catholic Relief Services (CRS) seeks a consultant or firm to conduct rapid feasibility studies for 18 community-prioritized infrastructure projects under the ACROSS Project in Bagudo and Dandi Local Government Areas of Kebbi State, Nigeria. The work will rely on community-held knowledge, visual inspections, stakeholder validation, and existing secondary data to produce concise, evidence-based feasibility reports that confirm project viability and refine implementation plans.
- Consultancy Terms of Reference for feasibility studies on ACROSS infrastructure projects
- Covers 18 prioritized projects across Dandi and Bagudo LGAs in Kebbi State
- Rapid methodology using community knowledge, visual inspections, and secondary data
- Implemented by CRS in partnership with NEYIF and funded by PATRIP Foundation
AI job guide
Use this guide to check salary signals, requirements, documents, application steps and safety before you apply.
AI salary guide
Not enough public dataNot enough public salary data is available for this exact role. Before applying, prepare to ask about gross pay, benefits, contract length, probation period, transport and any allowances.
Can you qualify for this role?
- UnclearRelated work experienceThe text mentions experience, but the exact level should be confirmed at source.
- RequiredEducation or certification mentioned in the postThe captured text mentions education, a diploma, certificate, or licence.
- PreferredPractical evidence in internship, entregador, restauranteThe tags and summary point to skills connected with this role.
- RequiredAvailability to work in Not specifiedThe vacancy is associated with this location.
- UnclearComfort with the Consultancy contract termsConfirm hours, duration, probation and benefits at the original source.
Documents to prepare
- Likely requiredUpdated CV
- Role specificCover letter or short employer message
- OptionalProfessional references
- Role specificAcademic or professional certificates
- VerifyID or passport only after verifying the employer
Application tips for this job
- Place your strongest Feasibility Studies of Infrastructure Projects on the ACROSS Projects in Kebbi State evidence in the first half of your CV.
- In your cover letter or employer message, connect your experience to Catholic Relief Services (CRS) and the role in Not specified.
- Add concrete examples related to internship, entregador, restaurante, ideally with measurable outcomes or clear responsibilities.
- Follow the instructions from Jobzilla Nigeria; avoid sending documents to unofficial contacts or copied links.
- Confirm the deadline, interview location and employer contact before sharing personal documents.
- Prepare a polite question about pay, benefits and contract terms for later interview stages.
Source and safety check
- Jobzilla Nigeria
- Original source link available
- Application method is clear
- Deadline not specified
- No major risk signal was detected in the captured text.
Never pay for interviews, shortlisting, medical checks, uniforms, or job placement. Confirm every application at the original source before sharing personal documents. Report suspicious listing.
Interview preparation
- What experience makes you a strong fit for this Feasibility Studies of Infrastructure Projects on the ACROSS Projects in Kebbi State role in internship, entregador?
- How have you handled responsibilities similar to those in this job post?
- Are you available to work in Not specified under the listed contract or schedule?
- Prepare examples with clear responsibilities, tools used and measurable outcomes.
- Review the source and research Catholic Relief Services (CRS) before the interview.
Ask what the first priorities will be in the role and how success will be measured.
Similar jobs to consider
Use AI to apply better
After confirming the original source, use Career Assistant to check role fit, tailor your CV and prepare a cover letter or employer message.
Original source description
Terms of Reference (ToR) for Feasibility Studies of Infrastructure Projects on the ACROSS Projects in Kebbi State at Catholic Relief Services (CRS)
⏲
Sep 21, 2026, 7:04 AM
⋕
View all NGO & Humanitarian / Nonprofit Organizations jobs
Catholic Relief Services (CRS) is an International non-governmental organization supporting relief and development work in over 99 countries around the world. CRS programs assist person on the basis of need, regardless of creed, ethnicity or nationality works through local church and non-church partners to implement its programs, therefore, strengthening and building the capacity of these partner organizations is fundamental to programs in every country in which CRS operates. CRS re-established presence in Nigeria m 2000 and currently focuses on agriculture, HIV and health extractives and governance, and peace building programming.
We invite applications for:
Title: Terms of Reference (ToR) for Feasibility Studies of Infrastructure Projects on the ACROSS Project in Bagudo and Dandi Local Government Areas of Kebbi State, Nigeria
Locations:
Geza, Fingillah, Shiko, Kamba, & Buma - Dandi LGA and Matsinkai, Kende, Tuga, & Kaoje - Bagudo LGA, Kebbi
Introduction
The project aims to catalyze inclusive, sustainable development in rural and semi-urban communities of Kebbi State through community-driven infrastructure planning and investment. Between April and June 2026, participatory infrastructure needs assessments and co-creation workshops were conducted in nine communities across Dandi and Bagudo LGAs. Each community produced a Five-Year Infrastructure Development Plan (2026–2030) containing five prioritized projects.
We are implementing the Advancing Cross-border Resilience and Opportunity for Safety and Stability (ACROSS) Project in Kebbi State in partnership with Northeast Youth Initiative for Development (NEYIF), with funding from the PATRIP Foundation.
To move from planning to implementation, CRS and NEYIF require feasibility studies for the first two (2) projects of each community (18 projects in total). Given the limited resources and the need for timely progress, a rapid feasibility assessment methodology will be employed. This will rely on community-held knowledge, visual inspections, stakeholder validation, and existing secondary data.
The output will be a concise, evidence-based report that confirms project viability, refines concept designs, provides realistic cost estimates, and identifies any critical environmental and social safeguards required
Objective of the Consultancy
The primary objective is to conduct feasibility studies for the complete portfolio of 18 prioritized infrastructure projects across the nine target communities, confirming their technical viability, environmental and social suitability, economic justification, and institutional sustainability.
The studies will provide sufficient information to:
Obtain necessary regulatory approvals such as environmental clearance, building permits, water abstraction permits, etc.
Make go/no-go decisions on each project.
Prepare Terms of Reference for subsequent detailed design and construction phases.
Present a compelling evidence base to government and potential funding partners.
Scope of Work
The scope is to produce feasibility-level assessments and documentation, not final engineering designs.
The consultancy will cover all 2 prioritized projects for each of the nine communities, as listed in the Five-Year Infrastructure Development Plans (see Annex A).
The tasks include:
Inception and Document Review:
Prepare and submit an inception report detailing the work plan, team composition, data collection tools, and a refined schedule.
Review all existing community infrastructure plans, needs assessment reports, and any prior technical data (maps, available borehole records, etc.).
Hold an inception meeting with CRS, NEYIF, and relevant government stakeholders to align expectations, methodology, and deliverables.
Field Assessments and Data Collection:
The consultant shall conduct comprehensive engineering surveys for all project sites where relevant. These surveys must sufficiently inform conceptual design, accurate quantity estimation, and future detailed design.
They include:
Document environmental and social settings, including any sensitive receptors, using checklists and community mapping.
Conduct indicative technical surveys sufficient for feasibility determination, such as: Walk-over site inspections and visual condition assessments, basic topographical reconnaissance (not a full survey; spot levels and cross-sections as needed for cost estimation and flood risk understanding), soil/geotechnical observations (trial pits or auger holes where required for structure foundation types), Hydrological/hydrogeological rapid assessments (stream flow observations, existing borehole yield tests or records, flood level community mapping), solar irradiation data collection for energy components (using satellite data or local weather records).
Visit all nine communities to verify site conditions, land ownership/availability, and community readiness.
Assess the existing infrastructure conditions like buildings, roads, drains, boreholes to determine the scope of rehabilitation and an approximate bill of materials.
Stakeholder Engagement and Community Validation:
Facilitate participatory design validation sessions to ensure the feasibility study captures user needs, accessibility for persons with disabilities, and gender-specific requirements.
Engage with community development associations, traditional leaders, women and youth groups, market traders, school-based management committees, WASH committees, and health facility committees to validate project scope, siting, and desired features.
Consult with Local Government Area (LGA) Works Departments, relevant state ministries (Works, Environment, Water Resources, Education, Health, Energy, Commerce), and regulatory agencies (RUWASSA, State Primary Health Care Development Agency, electricity distribution company) to align the feasibility-level proposals with government standards and secure early technical endorsement.
Environmental and Social Assessment:
For projects with potentially significant impacts, prepare a site-specific Environmental and Social Management Plan (ESMP) containing mitigation measures, monitoring indicators, and institutional responsibilities.
Conduct environmental and social screening for each project, using a standardized checklist or rapid assessment tool compliant with national regulations and international good practice.
Produce a simple summary of stakeholder consultations and how feedback was incorporated into the project concept.
Ensure the screening and ESMPs address gender, disability inclusion, and community health and safety.
Technical Feasibility Assessment:
Key dimensions and specifications (e.g., length and width of road, span of bridge, number and size of classroom blocks, borehole depth and estimated yield, capacity of market sheds, lumens and number of solar streetlights).
Proposed construction methods and materials, with justification based on local availability and sustainability.
For each project, describe the proposed intervention at a conceptual/preliminary design level, including:
Functional layout descriptions (e.g., room arrangement in a health post, stall layout in a market) supported by simple hand-drawn or computer-generated schematics but not detailed architectural/engineering drawings.
Identify any major technical risks and propose mitigation measures.
Cost Estimation and Economic Viability:
Highlight any assumptions about community contributions (labour, materials) and their monetized value.
Estimate recurrent operation and maintenance costs over 5 years.
Prepare indicative Bills of Quantities (BoQs) and Class D (feasibility-level) cost estimates for each project, based on prevailing unit rates in Kebbi State and lumpsum estimates for grouped items where detailed measurement is not feasible.
Implementation Planning:
Identify the next steps required to proceed with detailed design and construction, including additional surveys or assessments needed.
Propose a realistic implementation schedule for each project, accounting for seasonal constraints (rainy season) and community labour mobilization.
Institutional Capacity and Sustainability Assessment:
Review existing community management structures (WASHCOMs, School-Based Management Committees, Market Management Committees, Community Health Committees, Infrastructure Management Committees) and their capacity to operate and maintain assets.
For energy systems (solar boreholes, streetlights), include a maintenance and spare parts plan.
Recommend any training or organizational strengthening required and outline a simple sustainability plan for each project.
Reporting:
Produce a consolidated summary report covering all nine communities, with comparative tables of projects, costs, timelines, and key findings.
Provide all raw data (survey notes, geotechnical observations, water quality results, cost estimation spreadsheets) in digital format.
Produce a stand-alone feasibility study report for each community, clearly structured with an executive summary, site assessments, conceptual project descriptions, ESMP summary, cost estimates, implementation plan, and sustainability plan. The report should include simple schematics, photographs, and maps as necessary to illustrate the proposal.
Methodology
The consultants should detail their proposed methodology in the technical proposal, clearly indicating the level of technical detail that will be achieved for each sector (water, transport, buildings, energy, drainage) and how the outputs will meet the "next-step" readiness requirement without detailed engineering designs.
The technical proposal should detail the survey methodologies for each type of project, including equipment to be used, number and location of tests, and how data quality will be assured
The consultant is expected to employ a participatory, evidence-based methodology that includes:
Cost estimation based on local market surveys and validated rates.
Environmental and social screening using rapid assessment tools.
Desk review of existing plans and data.
Regular coordination with CRS, NEYIF, and government technical partners.
Rapid field appraisals using checklists, visual inspections, and community mapping rather than full-scale engineering surveys.
Deliverables
Consolidated Final Summary Report: Synthesising findings across all nine communities, with a clear comparative matrix of projects, costs, and implementation sequencing.
Inception Report (within 2 weeks of contract signing): Detailed work plan, methodology, tools, and timeline.
Community Validation Workshop Briefs (per community): Summary of the validation session, participant list, key feedback, and how it was addressed.
All deliverables must be of a quality suitable for presenting to government authorities, donors, and other external stakeholders.
Draft Feasibility Study Reports (one per community, plus a consolidated summary): Including feasibility-level technical descriptions, indicative BoQs and cost estimates, ESMPs, implementation schedules, and sustainability plans.
Raw Data Package: All field observation notes, cost estimation spreadsheets, environmental screening forms, and any hydrogeological/geotechnical data collected.
Final Feasibility Study Reports (3 hard copies per community, plus electronic copies in PDF and Microsoft Word/Excel): Incorporating all review comments. Simple schematics, sketches, and photos should be embedded; no CAD or detailed architectural drawings required.
Duration and Timeline
The assignment is expected to be completed within 8 weeks from contract signing, to accommodate the scope of the surveys across nine communities. The timeline is described below:
S/No
Phase
Activity
Duration
1
Phase 1
Inception and desk review
Weeks 1–2
2
Phase 2
Field data collection and community engagement (all nine communities)
Weeks 3–5
3
Phase 3
Feasibility analysis, costing, environmental/social assessments
Weeks 6–7
4
Phase 4
Draft report preparation, finalization and submission of all reports
Week 8
A detailed Gant chart is required in the technical proposal.
Consultant Qualifications
The consultancy team should include the following expertise:
Team Leader / Project Manager:
At least 10 years’
Experience
in managing rural infrastructure feasibility studies or similar pre-investment assessments, preferably in northern Nigeria.
Strong project management and community engagement skills.
Advanced Degree in Civil Engineering, Development Studies, or related field.
Infrastructure Engineer:
in rapidly assessing multiple infrastructure types (roads, drainage, small buildings, water points) and producing feasibility-level cost estimates and specifications.
Professional degree in Civil Engineering or related field; COREN registration is an advantage.
Water Supply / WASH Specialist:
Expertise in borehole condition assessment, solar pumping, and rural water supply.
Familiarity with WASH infrastructure in northern Nigeria.
Environmental Specialist:
Knowledge of Nigerian environmental regulations and international safeguards.
in environmental screening and preparation of ESMPs for small-scale rural infrastructure.
Social Development / Gender Specialist:
Fluency in Hausa and/or local languages of Kebbi State is highly desirable.
Demonstrated
in participatory community engagement, gender-sensitive and disability-inclusive design.
Quantity Surveyor / Cost Estimator:
in producing indicative BoQs and cost estimates using local market data.
Familiarity with construction costs in rural Kebbi State is an advantage.
Conclusion
These Terms of Reference outline a comprehensive yet time-sensitive assignment to produce robust feasibility studies for 18 prioritized infrastructure projects across nine communities in Bagudo and Dandi LGAs of Kebbi State. The engagement demands a highly experienced multi-disciplinary team capable of executing full-scale engineering surveys, participatory design validation, environmental and social assessments, and detailed cost estimation within a compressed 8-week period.
The successful completion of this consultancy will transform the community-driven Five-Year Infrastructure Development Plans from aspirational roadmaps into bankable, technically validated investment proposals. The feasibility studies will serve as the critical bridge between participatory planning and tangible implementation, enabling Catholic Relief Services, its partners, and the benefiting communities to approach government, donors, and private investors with the confidence that each project is viable, cost-effective, and sustainable.
CRS invite qualified consulting firms to submit proposals that demonstrate not only technical competence but also innovative approaches to meeting the 8-week delivery schedule without compromising quality. This is an opportunity to contribute to a landmark, community-led resilience-building programme in the rural communities of Dandi L.G. and Bagudo L.G., Kebbi State, Nigeria, with potential for replication and scaling across the region.
How to Apply
Interested and qualified consulting firms should submit separate Technical and Financial Proposals to:
tenders.ngr@crs.org
using
"NG20303 - ACROSS Infrastructure Feasibility Studies - Kebbi State" as the subject of the mail.
Application Instruction
The Technical Proposal must include:
Evidence of similar
(minimum three references with contact details).
Implementation schedule (Gantt chart).
Understanding of the ToR and how the proposed approach meets the requirement for full-scale surveys.
Detailed methodology and work plan, including survey techniques, equipment, and quality control.
Team composition with CVs of key personnel.
Evaluation Criteria
Evaluation Category
Weight
Key Sub-Criteria &
& Track Record
15%
• Evidence of successfully completed multi-site infrastructure feasibility studies with full-scale surveys in rural/semi-urban settings.
• Minimum of three verifiable client references for similar past assignments.
• Familiarity with international donor-funded projects and regional contexts in Northern Nigeria.
2. Methodology & Understanding
20%
• Comprehensive comprehension of objectives and scope for all 18 projects across nine communities.
• Robustness of survey techniques (topographical, geotechnical, hydrological, hydrogeological, solar, waste).
• Adequacy of data quality control, equipment specs, and adherence to Nigerian standards.
• Quality of stakeholder engagement, participatory design validation, and inclusion approaches.
3. Work Plan & Timeline Feasibility
10%
• Realism and completeness of the Gantt chart to fit the 8-week delivery window.
• Logical sequencing of desk review, field investigations, data analysis, and reporting phases.
• Risk management strategies for seasonal constraints or logistical challenges in Bagudo and Dandi LGAs.
4. Key Personnel Qualifications
25%
Team Leader:
Advanced degree in Civil Engineering, Development Studies, or related field. At least 10 years’
in managing rural infrastructure feasibility studies or similar pre-investment assessments, preferably in northern Nigeria
InfrastructureEngineer
: Professional degree in Civil Engineering or related field; COREN registration an advantage.
Water Supply / WASH Specialist:
Expertise in borehole condition assessment, solar pumping, and rural water supply.
Environmental & Social Specialists:
Advanced environmental screening/ESMP
and local language fluency (Hausa).
Quantity Surveyor: Professional
qualification for rural infrastructure BoQs and cost estimates.
FINANCIAL EVALUATION
30%
Overall Financial Evaluation Score
1. Budget Completeness & Cost Realism
15%
• Inclusion of all professional fees, equipment rentals, lab testing, travel, and engagement costs.
• Alignment of the fixed-price with the budgetceiling.
2. Value for Money
15%
• Clear financial breakdown mapped against major activities and deliverables.
• Efficiency in resource allocation for field logistics across target communities.
Annex A: First two proritized projects per community (18 Projects)
Bagudo Local Government Area:
Matsinkai Community:
Priority 1 Project: Construction of one block of 3 classrooms and rehabilitation of the existing one-classroom block, including sanitation facilities for male and female pupils.
Priority 2 Project: Construction of drainage channels and embankment for flood water.
Kende Community:
Priority 1 Project: Construction of Flood control embarkment/Retaining Wall.
Priority 2 Project: Construction of drainage channels.
Tuga Community:
Priority 2 Project: Rehabilitation of rural roads in the community (approximately 3 km).
Priority 1 Project: Construction of a bridge, drainage, and culverts.
Kaoje Community:
Priority 1 Project: Erosion control through restoration of land destroyed by gully erosion around the Allied Bank area and rehabilitation of damaged drainage channels.
Priority 2 Project: Rehabilitation of non-functional boreholes for water supply (3 units).
Dandi Local Government Area:
Geza Community:
Priority 2 Project: Construction of 2 blocks of 3 classrooms (one at Government Day Secondary School and one at Ilela Primary School).
Priority 1
Requirements
- ADMINISTRATIVE EVALUATION
- Pass/Fail
- Pass/Fail
- 1. Business Registration
- Pass/Fail
- • CAC Certificate
- • Minimum of three verifiable client references for similar past assignments.
- • Familiarity with international donor-funded projects and regional contexts in Northern Nigeria.
- 2. Tax Compliance
- Pass/Fail
- • Evidence of TIN Number
- • Valid/Recent TCC
- 3. Profile
- Pass/Fail
- • Firm Company Profile
- • Company Profile of partner (In case of sub-contracting any component of the service)
- TECHNICAL EVALUATION
- 70%
- Overall Technical Evaluation Score
- 1. Firm's