Jamub Group of Companies is hiring a Planning Engineer in Abuja (FCT), Nigeria. The role focuses on developing resource-loaded construction programmes, tracking site progress against baselines, and producing progress dashboards and variance analysis for road and infrastructure projects. The position sits within the company’s Architecture, Engineering & Construction division.
- Role based in Abuja (FCT)
- Focus on construction planning and scheduling
- Involves progress tracking and variance reporting
- Part of a diversified Nigerian conglomerate
AI job guide
Use this guide to check salary signals, requirements, documents, application steps and safety before you apply.
AI salary guide
Not enough public dataNot enough public salary data is available for this exact role. Before applying, prepare to ask about gross pay, benefits, contract length, probation period, transport and any allowances.
Can you qualify for this role?
- PreferredPractical evidence in planning engineer, engineering, project planningThe tags and summary point to skills connected with this role.
- RequiredAvailability to work in AbujaThe vacancy is associated with this location.
- PreferredCV evidence that matches Planning EngineerUse the summary and description to highlight related achievements.
Documents to prepare
- Likely requiredUpdated CV
- Role specificCover letter or short employer message
- OptionalProfessional references
- VerifyID or passport only after verifying the employer
Application tips for this job
- Place your strongest Planning Engineer evidence in the first half of your CV.
- In your cover letter or employer message, connect your experience to Jamub Group of Companies and the role in Abuja.
- Add concrete examples related to planning engineer, engineering, project planning, ideally with measurable outcomes or clear responsibilities.
- Follow the instructions from Jobzilla Nigeria; avoid sending documents to unofficial contacts or copied links.
- Confirm the deadline, interview location and employer contact before sharing personal documents.
- Prepare a polite question about pay, benefits and contract terms for later interview stages.
Source and safety check
- Jobzilla Nigeria
- Original source link available
- Application method is clear
- Deadline not specified
- No major risk signal was detected in the captured text.
Never pay for interviews, shortlisting, medical checks, uniforms, or job placement. Confirm every application at the original source before sharing personal documents. Report suspicious listing.
Interview preparation
- What experience makes you a strong fit for this Planning Engineer role in planning engineer, engineering?
- How have you handled responsibilities similar to those in this job post?
- Are you available to work in Abuja under the listed contract or schedule?
- Prepare examples with clear responsibilities, tools used and measurable outcomes.
- Review the source and research Jamub Group of Companies before the interview.
Ask what the first priorities will be in the role and how success will be measured.
Similar jobs to consider
Use AI to apply better
After confirming the original source, use Career Assistant to check role fit, tailor your CV and prepare a cover letter or employer message.
Original source description
Planning Engineer at Jamub Group of Companies
⏲
Sep 25, 2026, 1:04 PM
⋕
View all Consulting & Strategy jobs
Jamub Group of Companies is a diversified Nigerian conglomerate with active operations in construction, engineering, fintech, Oil & Gas, Fast-Moving Consumer Goods (FMCG), and agribusiness. Our Architecture, Engineering & Construction (AEC) division manages a growing portfolio of residential estates, institutional buildings, industrial parks, and road infrastructure projects across multiple states.
We are recruiting to fill the position below:
Job Title: Planning Engineer
Location: Abuja (FCT)
Key Accountabilities
- Workplan Development & Project Scheduling:
- Expected Result
- :
- The project has a realistic, resource-loaded workplan aligned to design, BOQ and site conditions that provides a reliable basis for execution and control.
- Translate design, BOQ and specification information into a resource-loaded schedule, aligning manpower, plant and materials to programme milestones.
- Secure Project Manager/PMO sign-off on the baseline programme before issue.
- Develop and issue the baseline construction programme (WBS to activity level) covering all road construction phases earthworks, sub-base, base course, drainage, structures and surfacing.
- Sequence activities logically, reflecting realistic productivity rates, weather/seasonal constraints and site access.
- Update and reissue the programme whenever scope, design or site conditions materially change.
- Targets:
- Programme reflects current approved scope/design — 100%
- Baseline programme issued and approved before mobilisation — 100%
- Programme revisions issued following an approved change — Within 3 working days
- Progress Monitoring, Tracking & Execution:
- Expected Result: Actual site progress is tracked accurately and continuously against the approved programme, giving management a reliable, real-time picture of project status.
- Maintain an accurate, current master schedule at all times.
- Verify reported progress against physical site conditions before issuing updates.
- Track daily/weekly site progress against the baseline and working programme.
- Conduct 2–4 week rolling look-ahead planning to drive short-interval execution on site.
- Produce S-curves, progress dashboards and variance analysis comparing planned versus actual progress.
- Targets:
- Variance between reported and verified site progress — Less than 5%
- Weekly/monthly progress reports issued within agreed cutoff — Within 24 hours
- Look-ahead activities completed as scheduled — At least 85%
- Site Coordination & Resource Alignment:
- Expected Result
- :
- Materials, manpower and equipment are mobilised ahead of programme need dates, and planning is fully integrated with site execution.
- Attend site progress and management meetings, providing technical planning input.
- Flag resource-driven schedule risks before they affect the critical path.
- Coordinate with procurement, stores and site teams to ensure resources are available ahead of scheduled activities.
- Work with Site/Project Managers to translate the programme into practical daily/weekly work orders.
- Targets:
- Scheduled planning/site coordination meetings attended — 100%
- Resource-driven delays attributable to late planning input — Zero
- Delay Identification, Escalation & Recovery Planning:
- Targets:
- Schedule risks flagged ahead of critical path impact — At least 2 weeks' notice
- Unresolved critical delays without escalation — Zero
- Recovery plan issued after a confirmed delay — Within 3 working days
- Expected Result: Schedule risks and delays are identified early, escalated promptly, and addressed through realistic recovery plans that protect the overall completion date.
- Continuously monitor the critical path and identify activities at risk of slippage.
- Escalate schedule risks and delays that may affect overall project completion.
- Investigate root causes of delay in coordination with Site/Project Managers.
- Develop and issue recovery/mitigation plans for confirmed delays.
- Reporting, Documentation & Programme Control:
- Targets
- Planning records maintained and retrievable — 100%
- Programme updates version-controlled and approved before reissue — 100%
- Monthly S-curve/variance report issued — By agreed date, error-free
- Expected Result: Programme documentation is accurate, current and properly controlled, giving management and clients confidence in reported project status.
- Maintain full version control and approval trail for all programme issues and revisions.
- Support cost/time impact assessment of variations, delays and change orders.
- Maintain organised records of planning data, productivity rates and lessons learned for future projects.
- Prepare and issue accurate progress and variance reports to management and, where required, client/consultant teams.
- Schedule Projection Accuracy & Accountability:
- Expected Result: The Planning Engineer holds full, direct accountability for the accuracy and reliability of the project's schedule projection from baseline to completion; projections are realistic, defensible and current at all times.
- Immediately disclose and correct any identified projection error, however it arose.
- Own the end-to-end integrity of the project's time projection, ensuring it reflects true site status at every reporting cycle.
- Proactively verify projections against actual progress rather than relying on assumed rates or unconfirmed inputs.
- Treat any projection failure — an inaccurate, outdated or undisclosed projection — as a critical planning lapse requiring immediate correction.
- Targets:
- Projection accuracy verified against actual site progress — Every reporting cycle
- Identified projection errors corrected from detection — Within 48 hours.
- Unexplained or undisclosed projection failure — Zero tolerance
- How to Apply
- Interested and qualified candidates should send their updated CV to:
- jobs@jamubgroup.com
- using “Planning Engineer” as the subject of the email.
- Application Deadline:
- 10th October, 2026.
- View all Jobs in Nigeria
- Abuja
- Planning Engineer job vacancies in Nigeria